High Link Visits Guangzhou Nansha Port Phase IV Fully Automated Terminal-香港海聯船運有限公司 Location:Home » News » Company Ne..
High Link Visits Guangzhou Nansha Port Phase IV Fully Automated Terminal
Addtime: 2023-08-29
Clicks:1328

1693282598270.jpg

The fully automated wharf of Nansha Port Area Phase IV of Guangzhou Port is located at the mouth of the Pearl River, and is located in Nansha Port Area, which connects the inland river network of the the Pearl River River system with the deep-water seaport. It integrates technologies such as Beidou navigation, 5G communication, artificial intelligence, and unmanned driving. From automation equipment hardware to information systems, it adopts a new generation of automated container terminal technology, creating more than 60 patents, including 31 invention patents. It is a fully automated terminal for multimodal transportation of the Yangtze Sea Railway, with four 100000 ton seagoing ship berths and supporting container barge berths.



Copyright © High Link (HK) Shipping Ltd  

Technical support: